QUESTION:
Is it possible to have a location directive based
on the report as finished quantity?
- Batch order for a finished good item, report, as finished, is done with production floor execution (or also applicable, with the job card device)
- Report as finished is done on production output location linked to the resource. It is the last (end) operation of the batch order.
- Reporting is done in UoM boxes, report as finished each time 30 boxes (is one full pallet) and a license plate are generated.
- The last report as finished action can be e.g. 12 boxes, which is not a full pallet.
- Question: can a putaway request be made based on the quantity produced? For a full pallet put location is e.g. BULK and for a non-full pallet put location is e.g. OVER.
Production exists of producing multiple items with multiple different
quantities per full pallet, so it is not preferred to set up a separate set up per
item but preferable to a general setup. How can this scenario be achieved?
ANSWER:
Configure the location directive > Lines based on the quantity and UOM. In the below example I'm targeting Over location when work QTY is between 11 and 100.
No comments:
Post a Comment